docs(04): complete phase 4 verification and roadmap

Mark Phase 4 complete in ROADMAP.md, add VERIFICATION.md (6/6
automated checks passed), and update phase 02 continue-here artifact.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
Mikkeli Matlock
2026-02-18 07:52:38 +09:00
parent 177e13a2f8
commit 26cdf24874
3 changed files with 110 additions and 50 deletions
+4 -4
View File
@@ -15,7 +15,7 @@ Decimal phases appear between their surrounding integers in numeric order.
- [x] **Phase 1: Foundation** - Establish directory structure and extract models (COMPLETE 2026-02-09)
- [x] **Phase 2: Provider Migration** - Replace setState with proper state management (COMPLETE 2026-02-10)
- [x] **Phase 3: Overlay Refactor** - Fix overlay communication reliability (COMPLETE 2026-02-11)
- [ ] **Phase 4: GPS & Power Optimization** - Implement adaptive precision and lifecycle management
- [x] **Phase 4: GPS & Power Optimization** - Implement adaptive precision and lifecycle management (COMPLETE 2026-02-12)
## Phase Details
@@ -103,8 +103,8 @@ Plans:
**Plans**: 2 plans
Plans:
- [ ] 04-01-PLAN.md — Core GPS engine: precision switching, lifecycle management, wake lock control
- [ ] 04-02-PLAN.md — UI integration: main app staleness detection, screen cleanup, provider wiring
- [x] 04-01-PLAN.md — Core GPS engine: precision switching, lifecycle management, wake lock control (4.9 min)
- [x] 04-02-PLAN.md — UI integration: main app staleness detection, screen cleanup, provider wiring (3.35 min)
## Progress
@@ -116,7 +116,7 @@ Phases execute in numeric order: 1 -> 2 -> 3 -> 4
| 1. Foundation | 2/2 | **COMPLETE** | 2026-02-09 |
| 2. Provider Migration | 2/2 | **COMPLETE** | 2026-02-10 |
| 3. Overlay Refactor | 2/2 | **COMPLETE** | 2026-02-11 |
| 4. GPS & Power Optimization | 0/2 | Not started | - |
| 4. GPS & Power Optimization | 2/2 | **COMPLETE** | 2026-02-12 |
## Notes